Sorry, you need to enable JavaScript to visit this website.

dob

Department of Buildings

DOB is excited to introduce Pop-Up Permits (PUPs), our new pilot program for customers to get a streamlined Certificate of Occupancy (C of O) for temporary use of a previously vacant building for up to one (1) year - all without going through the traditional permitting process to maximize the time the space can operate. Learn more about Pop-Up Permits (PUPs).

DOB
Menu Button
 

Welcome to the Department of Buildings

1 I Need To...
keyboard_arrow_right
2 ...
keyboard_arrow_right
3  

Special Sign Permit

Permit Description

Special signs are authorized by the District of Columbia Council for specific locations. (32 total locations authorized). A permit is needed for copy changes and changing locations.

Submission Requirements

  1. For copy changes, pictures of the new image can be provided for review and approval.
  2. Location changes require architectural plans showing dimensions of the sign, how it will be supported and mounted.
    1. A map with the current location of the sign and the new location will be required to ensure the change is within an authorized location.

Application Process

Updated information coming soon.

 

Apply for a Permit

 

Permit Timeline

 

Contact TTY: 
711