DOB is excited to introduce Pop-Up Permits (PUPs), our new pilot program for customers to get a streamlined Certificate of Occupancy (C of O) for temporary use of a previously vacant building for up to one (1) year - all without going through the traditional permitting process to maximize the time the space can operate. Learn more about Pop-Up Permits (PUPs).

DOB
Menu Button
 

Welcome to the Department of Buildings

1 I Need To...
keyboard_arrow_right
2 ...
keyboard_arrow_right
3  

Demolition Permit

Permit Description

The removal of interior and/or exterior elements, systems or finishes (not a raze).

Submission Requirements

  1. Interior and exterior demolition of less than 5,000 square feet, pictures are required to complete the plan review. (If your property is not within a historic district, you can apply, pay and receive a postcard permit online). Please check our Property Information Verification System (PIVS) to confirm.
  2. For projects that exceed the above square footage, plans will be required for review along with pictures to show what is existing.
  3. Demolition work can also be included in the submission of your building permit, depending on the timeline of your project. (Please ensure to detail demolition details within your description of work and within your drawing submittal)

 

Application Process

  1. Begin your permit application under the permit type of Demolition Permit.
  2. Complete all required questions/fields (i.e. cost of demolition and how you will remove demolished material)
  3. Upload a formal quote, contract agreement or MS report and submit to pay the filing fee.
  4. Your application will be reviewed for next steps to begin the plan review. (Please view the plan review criteria for the two types of plan review).

 

Apply for a Permit

 

Permit Timeline

 