Publications
The below Building Code Interpretations are created to simplify certain building codes. Please be on the lookout for additional Building Code Interpretations published in the future on this webpage.
Proactive Inspection Schedule - September 2022
eRecords Electronic Records Management System Guide_06.03.2022
Because the Zoning Regulations contain several provisions regarding the regulation of Accessory Buildings, the Office of Zoning Administration has summarized these regulations in RF zones for clarity:
Proactive Inspection Schedule - September 2021
CC2021-001
Requirement to Report Unsafe and Emergency Conditions
The longstanding practice of the Office of Zoning Administration allows accessory buildings which are non-conforming due to not meeting required yard setbacks and/or contributing to an excessive lot occupancy, to be razed…
Under Section K-811.9(a), the amount of street frontage for eating and drinking establishments is limited to not more than 50% of specified blocks in the Mixed-Use Uptown Arts Zones.
The Zoning Administrator has determined that a Certificate of Occupancy for an existing hotel would not need to be changed to allow an extended stay hotel operation. A hotel or lodging use is permitted to have short term [i.e.
Section B-304.8 excludes certain portions of an interior of a building from the calculation of Gross Floor Area [GFA]:
