Services

The testing and surveying of soil to determine capability. Review of this permit requires the approval District Department and Energy and the Environment (DOEE).

A solar panel is designed to absorb the sun’s rays as a source of energy for generating electricity. A separate electrical will be needed for installation.

A limited number of “Special Signs” can exist under District law (as defined in the District of Columbia Municipal Regulations). However, the District has a permanent moratorium on new permit issuances to erect or construct a Special Sign.

A swimming pool permit is needed for the construction of and modification to a swimming pool. Separate permits may needed for the installation of water systems.

The work necessary to finish the interior layout of space previously permitted under the construction codes (base building permit). Includes first occupancy of space.

Getting an inspection is a crucial part of the construction process, ensuring that a project is safe and complies with DC laws and regulations.
Customers

To erect a tower crane. Other permits may be needed such as a DDOT permit for locations that involve public space.

Used for the collection of underground water storage. Separate reviews are required from the District Department and Energy and the Environment (DOEE).
