Sorry, you need to enable JavaScript to visit this website.

dob

Department of Buildings
DOB
Menu Button
 

Welcome to the Department of Buildings

1 I Need To...
keyboard_arrow_right
2 ...
keyboard_arrow_right
3  

Publications

E.g., 12/11/2024
E.g., 12/11/2024
06/20/2024

Zoning Administrator Interpretation ZA-032: Applying Inclusionary Zoning Standards to Co-living Dwelling Units

05/03/2024

Interpretation ZA-007: Roof Top Architectural Element is superseded in part by D.C. Municipal Regulations Title 11, Subtitle E, Section 204.1 and 204.2. 

ZA-007
05/01/2024

References:

o D.C. Official Code § 7-1761.01, et seq.

o 11 DCMR Subtitle A, Chapter 1.

o 11 DCMR Subtitle B, Chapter 2.

o 11 DCMR Subtitle I, Chapter 3.

o 11 DCMR Subtitle K, Chapter 6.

o 11 DCMR Subtitle U, Chapters 5-8.

02/02/2022

Because the Zoning Regulations contain several provisions regarding the regulation of Accessory Buildings, the Office of Zoning Administration has summarized these regulations in RF zones for clarity: 

ZA-028
02/05/2021

The Office of Zoning Administration has a long-standing practice that it will recognize a submitted building permit application that is considered complete for foundation to grade and/or new construction of the permanent...

ZA-023
02/05/2021

Section D-805.1, which denotes the Wesley Heights Overlay map entitled "Required Front Yard Setbacks” for the R-14 and R-15 zones, illustrates the required front yard setback dimensions for these areas: 

ZA-021
02/05/2021

Section B-304.8 excludes certain portions of an interior of a building from the calculation of Gross Floor Area [GFA]: 

ZA-026
02/05/2021

The Office of Zoning Administration has reviewed several applications where a portion of a top of a building is being used as roof deck which is adjacent to a partial top story at the same level.

ZA-024
02/05/2021

The longstanding practice of the Office of Zoning Administration allows accessory buildings which are non-conforming due to not meeting required yard setbacks and/or contributing to an excessive lot occupancy, to be razed...

ZA-029
02/05/2021

This interpretation summarizes the standard operating procedure (SOP) between DOB’s Office of Zoning Administration and the Office of the Surveyor regarding the condition of a Record Lot that is overlain by an Assessmen

ZA-022

Pages

Subscribe to Publications List